Bismarck's barbettes are sealed with a styrene plate which I will drill holes out for mounting the cannons. The radio bod has it's rails instead and resin. Time to bring the model back to the Stokomoto shipyard and get the internals installed.
I got the cannons installed in thier barbettes. No hookups yet with the plumbing. Motor is installed just needs to be wired.
Ahh finally got the time to continue the work on Bismarck. So far I've tackled building a Rudder platform mearusing out the interior of the Radio box for the servos and basically found all the stuff I need to finish it. Took more time to find my stuff but now to get back at it.